On tonight’s bike ride I noticed new signs in River Bends indicating that a dead-end loop of trail (including all of the the newly paved stuff) is marked as a Bike Route. There is a sign leading into this pavement indicating so, and the sign above is seen on the way out. This strikes me as a bit odd, as there are no Bike Route signs at the entrances to River Bends, and were one to follow those signs expecting a way through, a rider would just find the trail looping back on itself through some rather rough sections.
I suppose I could take this as a good sign (ha ha!), indicating that the trail connecting River Bends and Utica together will be completed soon. Unfortunately, a past conversation that I had with the engineer of the new trail project indicating that the trail is to end there for the time being until funding to complete the trail is found. I suspect that the signs are part of the bigger project and this plan, and were installed simply so one could say that this segment is complete. Now, if only the remaining few-mile segments between Rochester / the Bloomer rail trail, River Bends, and Clinton River Park (behind Dodge Park) would be completed.