I’ve been on vacation for the last week or so (since the 3rd), and much of this time has been spent working on a new 1.3 mile segment of single track trail at River Bends. As of this afternoon it is now signed and open and can be considered complete. All work on this segment from here on out will be tweaking or maintenance; initial building is done.
The image above shows the entrance to this new segment. This spot had previously been a wall of brush, best illustrated here at the end of a trail ride video from River Bends where the rider turns left after exiting the single track. Now riders can continue straight and ride another long segment of twisty single track. This takes the place of riding some relatively flat two track which had a couple unpleasantly blind corners. An updated copy of the River Bends Trail Map (PDF) shows this new segment of trail, the eastern yellow line which flows north between the asphalt and two track.
While I did a fair bit of work on this trail segment laying it out and doing a bunch of the rough cutting and such, it would not have been possible to build this without loads of help from other volunteers. Some folks (in particular Jeremy Verbeke and Paul McAllister) were able to help out in the middle of the week, while others donated their time and effort during a scheduled trail day on October 9th where our numbers (21 people!) allowed us to finish most of the work resulting in something recognizable as a trail.
Thank you to everyone who was involved with this; we’ve got more trail!