nuxx.net

Permanent Signs at River Bends

On Thursday I headed out to River Bends with Spencer Wood, the Eagle Scout candidate who built the trail head kiosk and is working on the trail signage. He and I placed a bunch of WRONG WAY signs along the single track clearly illustrating it as one-way trail, and signs were also placed along the two track. All placed signs are color coded to match the map, and the directional signs match the directional arrows. This is a really big step in the construction of the trails, as it establishes the trails with permanent signage which matches the published map and the forthcoming trail head information.

Conveniently we were able to arrange it so that the temporary signs placed last November could be reused (in place) in most areas, reducing the need to remove signs and the effort and associated waste. The seasonal loops (blue signs / route) is currently unridable and thus not completely signed, but this should be done within a couple weeks; hopefully some time after next weekend.

Here’s a few more photos of the new signs:

· In the parking lot at River Bends getting ready to hang more trail signs.
· Start of Phase 1 of the single track at River Bends showing the entrance to the single track (yellow signs) or multi-directionality of the two track (green signs).
· Wrong way sign on a stake at the end of the normal single track due to there being no trees to affix it to.
· Sign indicating the start of the two track at the current end of the asphalt path at River Bends.
· New signs (yellow and blue) at the beginning of the seasonal loops at River Bends.

Exit mobile version