With a total of 39.5 volunteer hours spent during a rainy trail day of bench cutting, installing a new bridge, (which Pete designed specifically for the space), raking, trimming, and generally finishing off the trail, Phase II of the single track trails at River Bends are now open. While the trails are still a bit slippery from the last couple days of rain, they should be quite nice to ride.
Once I was done taking a break after the trail day I then headed back to River Bends and walked the new part of the trail with My Tracks recording the route. This data, combined with stuff gathered on previous mapping trips, allowed me to make this map showing all the park-recognized paths within the park. While just the first revision, I’m still quite happy with how it’s all coming along. There’s now a ridable, cohesive loop of multiple miles of single track.
Now to get to finishing the other loops that hang off of it. They already exist, but need both some cleanup and trimming before they’ll be properly ridable. Right now getting through some parts of them is akin to riding down a corn row.